The Bastian Guide · Cost Guides · Updated October 2026

§ Cost guide · Northern Colorado

What a kitchen remodel
costs in Northern Colorado.

Published local guides put most Northern Colorado kitchen remodels between about $15,000 for a cosmetic refresh and well over $100,000 for a custom renovation. Here's what actually moves the number — and how to budget before you call anyone.

Remodeled kitchen with custom cabinetry and stone countertops
Fig. 01 · Planning numbers for 2026.

§ 01

The short answer

There's no single price for a kitchen, but there are clear tiers. One Northern Colorado contractor's 2026 breakdown puts a cosmetic refresh at $15,000–$28,000, a mid-range remodel with new cabinets and quartz in the same layout at $45,000–$75,000, and a full remodel with layout changes at $85,000–$140,000 or more (Integrity Stamp of Approval). Custom design-build kitchens in the region run higher: one local design-build firm publishes an all-in range of $100,000–$200,000 including design and project management (Hutch Design Build).

ScopeWhat's includedTypical 2026 range
Cosmetic refreshPaint, hardware, backsplash, appliances; cabinets stay$15,000–$28,000
Mid-range remodelNew cabinets, quartz counters, lighting, same layout$45,000–$75,000
Full remodelWalls moved, island added, higher-end finishes$85,000–$140,000+
Custom design-buildDesign, custom cabinetry, full project management$100,000–$200,000+

Ranges compiled from published Northern Colorado contractor guides listed below. They're planning numbers, not quotes.

§ 02

What drives the cost

Cabinetry is the biggest line. Cabinets typically account for 30–40% of a kitchen budget (eHeart Design; Homework Build). Local 2026 pricing runs roughly $110–$200 per linear foot installed for stock cabinets, $220–$400 for semi-custom, and $450–$750+ for shop-built custom (Integrity Stamp of Approval).

Counters and appliances come next. Installed quartz runs about $75–$135 per square foot in Northern Colorado, and quartzite or premium natural stone $120–$200+. A mid-range appliance package is about $8,000–$14,000; a premium package can run $18,000–$45,000 or more (Integrity Stamp of Approval).

Layout changes multiply everything. Moving a sink, a range, or a wall adds plumbing, electrical, structural work, and often engineering. Keeping the existing footprint is the single biggest lever for controlling cost.

The age of the house matters. Older homes in central Fort Collins, Loveland, and Greeley often reveal wiring, venting, or framing that has to be brought up to current code once walls are open. Newer homes rarely have those surprises but often need better ventilation and lighting than the builder installed.

§ 03

Permits and timeline

In Fort Collins, remodels that move walls or add plumbing or electrical work generally require a permit through Building Services (City of Fort Collins); surrounding towns are similar. Permit fees are a small share of the budget, but the review time needs to be in the schedule.

Construction on a full kitchen typically runs 6–12 weeks, plus design, selections, and ordering beforehand (eHeart Design). Custom cabinetry is usually the long lead item — ours typically needs 8–12 weeks from final design approval, so we order it during design rather than after demolition.

§ 04

How to budget

Decide your scope tier first, then set a number, then add a contingency. Local builders commonly recommend holding 10–15% above your target for conditions you can't see until the walls are open (Homework Build). Choose appliances early — their sizes and utility needs shape the cabinet design, and changing them late is expensive.

When you compare bids, make sure they include the same things: design, permits, cabinetry grade, counters, appliances, electrical, plumbing, flooring, and cleanup. A low number that leaves out design or allowances isn't a lower price — it's a different project.

§ 05

Where Bastian projects land

We build at the custom end of the market: kitchens designed around shop-built cabinetry, with design, permitting, and construction managed by one team. Our published bands start at $55,000–$95,000 for a refresh within the existing footprint and run $120,000–$220,000 for a full renovation, with wall-out architectural kitchens above that. The kitchen remodeling page explains each tier and what's included.

§ FAQ

Questions we hear
about cost.

How much does a kitchen remodel cost in Fort Collins?

Published 2026 guides for Fort Collins and Northern Colorado put a cosmetic refresh around $15,000–$28,000, a mid-range remodel around $45,000–$75,000, and a full remodel with layout changes at $85,000–$140,000 or more. Custom design-build kitchens commonly run $100,000–$200,000+.

What is the most expensive part of a kitchen remodel?

Cabinetry, which typically accounts for 30–40% of the budget. Counters, appliances, and any layout changes that move plumbing or walls are the next largest drivers.

How long does a kitchen remodel take in Northern Colorado?

Construction on a full kitchen typically runs 6–12 weeks, plus several weeks for design, selections, permitting, and ordering. Custom cabinetry is usually the longest lead item.

Do I need a permit for a kitchen remodel?

If the work moves walls or adds or changes plumbing, electrical, or gas, you'll generally need a permit from your city or town. Purely cosmetic work like paint and hardware usually doesn't.

§ More guides

Planning something else? Read our Basement finishing cost · Bathroom remodel cost · Custom home cost guides, or see how we approach kitchen remodeling and the towns we serve.

§ Next step

Get a real number
for your house.

Book a free walk-through. We'll look at the space, talk through scope and budget, and tell you plainly what it will take.